Clearwater Harbor Marina N-E Walkway & Gangway Replacement
- Response deadline
- Sep 2, 2026 Closed
- Date posted
- Jul 22, 2026
- Source
- Open notice
Description
The scope of this project includes the replacement of seven (7) floating docks on the main dock walkway, marginal wharf and B-Dock, three (3) finger piers, electrical and mechanical utilities within the project area, and replacement of cable-connections within the floating dock to accommodate the removal of the wave attenuators. The floating docks will be replaced by five (5) 13-foot-wide floating docks along the walkway, and one (1) each 10-foot-wide floating dock, and three (3) 4-foot-wide by 45 foot-long finger pier in the orientation presented on the drawings. Due to damage from boat impact during hurricane Milton, two (2) new 8-foot-wide by 31-foot long aluminum gangways are to be installed at the existing platform and dock that is remaining. Also, new piles including pile guides as shown on the drawings will need to be installed to anchor the remaining portions of the marginal wharf. The work also includes replacing the water, fire and electrical lines that run along the dock from the marginal wharf through A-dock due to damage from the hurricane and replacement needed based on the removal and replacement of floating wave attenuators.
Documents
No documents posted for this opportunity.
Similar contracts
- Wastewater Collections Point Repair and ImprovementsFLDue Oct 28, 2026
- Marshall Street WRF Sand Filter RehabilitationFLDue Oct 8, 2026
- State Road (SR) 60 Trailhead ParkFLDue Oct 7, 2026
- Rehabilitation of Lift Station 13, 51, and 58FLDue Sep 30, 2026
- Construction Manager at Risk - Clearwater Baseball Campus EnhancementsFLDue Sep 8, 2026
- Osceola Avenue Corridor ImprovementsFLDue Sep 21, 2026