Civic AI
Civic AI
Procurement intelligence
OpenGov / IonwaveITB#202627
Open

Barrier Walls for Lucy Switching Station

City of Homestead — HPS Energy | Electric Services · FL
Response deadline
Jul 24, 2026
Due in 5 days
Date posted
Jun 26, 2026

Description

Homestead Public Services (HPS Energy) seeks qualified and experienced contractors to furnish and install a prefabricated concrete perimeter barrier wall at the Lucy 138kV Switching Station. Lucy is a critical asset because it serves as the primary tie-in point for the Florida Power & Light (FPL) feeder. Protecting the infrastructure at the Lucy Station is critical for HPS Energy system reliability. The goal of this project is to install high-strength concrete barriers to harden the station against physical threats and environmental damage. Because Lucy operates in an energized 138 kV environment, the selected contractor must have documented experience furnishing and installing similar barrier walls at electric utility stations. Stations that are energized during construction. Interested vendors must have a "safety-first" mindset and experience with utility-scale structural work are the main things we are looking for. HPS Energy seeks a partner who can do this work in accordance with the specifications and building code, and on schedule. Vendors with documented experience in heavy concrete work in industrial or utility settings are encouraged to submit a bid response. The City of Homestead is an Equal Opportunity Employer and encourages participation from MBE/WBE/DBE businesses.

Documents

No documents posted for this opportunity.

Explore more