SAM.govW912PF26RA011
Open
Design-Bid-Build (DBB) Repair of Storm Sewer Water and Sanitary Sewer Systems, Caserma Miotto, Longare, Vicenza, Italy.
- Response deadline
- Aug 28, 2026 Due in 18 days
- Date posted
- Aug 10, 2026
- Source
- Open notice
Similar contracts
- WINTERS RANCH WELL CLEANINGSDue Aug 25, 2026
- GAOA LDV Crystal Lakes Water & Septic Resuscitation, PSICC, ColoradoColoradoDue Sep 15, 2026
- Gavins Point Raw Water Intake Zebra Mussel MitigationDue Sep 4, 2026
- Drain line Replacement Due Aug 21, 2026
- Y--GLBA REHAB WATERLINEDue Aug 20, 2026
- FY26 ? Medical University of South Carolina (MUSC) Pump UpfitDue Sep 8, 2026