Wilkinson Hall New Boiler Room at Southern CT State University, New Haven
- Response deadline
- Jun 23, 2026 Closed
- Date posted
- May 14, 2026
- Source
- Open notice
Description
Removal of existing heating & hot water heat exchanger, glycol heat exchanger & pump, domestic water heating mixing valve & circulator, modifications to the gas service & piping into the building. Removal & capping of the campus high temperature hot water piping at the penetration into the room (piping is deenergized). Turn over existing ACE water heater to SCSU. New construction includes rigging, installation of two owner provided AERCO boilers & all accessories, venting, piping, pumps, controls & wiring associated with hot water system , glycol heat exchanger & pumps, 2 indirect domestic water heaters, mixing valves & circulator, backflow prevention device on incoming water service, and electrical power to support the equipment including a new panel. DDC system integration w/existing BMS system serving the building/campus.
Classifications
- NAICS72151200
Documents
No documents posted for this opportunity.
Similar contracts
- 26-6 District-Wide HVAC Operations, Maintenance, and Technical Support ServicesCTDue Jul 24, 2026
- 26-6 District-Wide HVAC Operations, Maintenance, and Technical Support ServicesCTDue Jul 24, 2026
- Solar PanelsCTDue Jul 27, 2026
- Solar PanelsCTDue Jul 8, 2026
- Norwalk Fire Station 4 Renovation and Addition-Trade BidsCTDue Jun 24, 2026
- WATER POLLUTION CONTOL FACILITY (WPCF) HVAC RTU REPLACEMENT, 2026CTDue Jul 16, 2026