Civic AI
Civic AI
Procurement intelligence
fl_mfmpITB-17067
Open

ECEP Cooling Tower Basin Improvements

Response deadline
Oct 26, 2026
Due in 31 days
Date posted
Sep 24, 2026

Description

The scope of work for ECEP Cooling Tower Basin Improvements includes, but is not limited to: A. Provide and Install sluice gates at (3) existing basin openings in between cooling tower cells 3 and 4 B. Provide and Install a 24" CWR bypass pipe between the north side header to the south side header C. Provide and Install butterfly valves at the connection to the existing north header and at the connection to the existing south header D. Replace the pneumatic actuators with electric actuators on the existing cooling tower inlet valves for Cooling Towers 1,2, and 3 E. Replace the butterfly valve and pneumatic actuator with an electric actuator at the tower inlet for Cooling Tower 4 F. Provide and install isolation butterfly valves in the main condenser water header between the takeoffs for CT-1 and CT-2, between the takeoffs for CT-2 and CT-3, and between the takeoffs for CT-3 and CT-4 G. Provide and install solenoid valves at the chemical treatment discharge pipes for each cooling tower basin H. Provide control modifications for operation of the sluice gates, tower isolation valves, header isolation valves, and chemical treatment discharge valves You must be a registered bidder through PlanetBids™ to obtain the supporting attachments to this project. BID LINK HERE: https://vendors.planetbids.com/portal/62171/bo/bo-detail/146496

Classifications

Documents (1)

  • C007159 MFMP Bid Flyer.pdf
    application/pdf331 KBNot yet available

Contacts

Similar contracts

Explore more