ct_source39041
Open
Water Meter Installations at the Willimantic Camp Meeting Association Windham
- Response deadline
- Oct 2, 2026 Due in 2 days
- Date posted
- Sep 17, 2026
- Source
- Open notice
Description
The work consists of the modification of existing plumbing at six (6) residences at the Willimantic Camp Meeting Association (WCMA) community to allow for the installation of 5/8 inch water meters. WWW shall shut off water service to the properties and provide the water meter and couplings necessary for its installation by the Contractor. The selected Contractor shall be responsible for providing all other labor and materials, including coordination and scheduling with WCMA, the tenants, and WWW. Work may be performed as tenant availability allows; however, work during WWW normal hours of operation is preferred whenever possible, which is between 7:00 A.M. and 3:00 P.M., Monday through Friday.
Classifications
- NAICS72101510
Documents (1)
- WCMA Meter Installation ITB_Final.pdfapplication/pdf1.5 MBNot yet available
Contacts
Similar contracts
- City Bid - Cooling Tower Upgrade at Terry Conners Ice RinkCTDue Aug 28, 2026
- City RFQ & RFP - Architectural & Engineering Services for Roof Replacement at HCTDue Aug 20, 2026
- WPCA Bid - On-call Millwright Services for Installation and/or Repairs of WasteCTDue Jul 16, 2026
- WPCA Bid - On-call Millwright Services for Installation and/or Repairs of WasteCTDue Jul 23, 2026
- On-Call Plumbing Repairs Services 26-20017 IFBCADue Oct 14, 2026
- C5613488-D - Oxidation Ditch Aerator Maintenance and Repair ServicesCADue Oct 5, 2026