Seymour No. 4 Dam Improvements
- Response deadline
- Oct 6, 2026 Due in 8 days
- Date posted
- Sep 1, 2026
- Source
- Open notice
Description
Replace the existing spillway with a concrete drop inlet strucure with 48-inch discharge pipe and energy dissipator at the downstream end. A new 16-inch outlet pipe controlled by a stainless steel slide gate will be installed in the drop inlet spillway structure. Installation of a new valve and extension stem on the existing low level outlet upstream of the dam at the bottom of the reservoir. Trees will be cleared from the embankments and the downstream slope will be filled in the vicinity of the new spillway discharge pipe and energy dissipator. Eroded areas on the crest will be repaired, the crest will be raised one foot. Riprap will be placed on the upstream slope. Construction of a 100-foot long auxiliary spillway with concrete core wall. Clear trees and stumps from left dike, topsoil and seed with grass.
Classifications
- NAICS95000000
Documents (3)
- 10809_ContractDrawings_SeymourNo.4DamImprovements_Feb2026.pdfapplication/pdf4.4 MBNot yet available
- Seymour Reservoir No. 4 Dam Project Manual August 2026.pdfapplication/pdf7.1 MBNot yet available
- 009-DEEP Standard Bid Terms and Conditions.pdfapplication/pdf85 KBNot yet available
Contacts
Similar contracts
- Invitation to Bid for Construction ServicesCTDue Oct 14, 2026
- Town of Farmington Bid 386 - Tunxis Mead Basketball Courts RehabilitationCTDue Sep 17, 2026
- Pump Base and Slide Rail Upgrades at Two (2) Pump StationsCTDue Aug 14, 2026
- Bid # 2026-35: Resurfacing Existing Running TrackCTDue Aug 28, 2026
- Invitation to Bid for Construction ServicesCTDue Aug 24, 2026
- Invitation to Bid for Construction ServicesCTDue Aug 24, 2026