Request for Qualifications for Construction Manager at Risk (CMR) Services
- Response deadline
- Sep 24, 2026 Due in 28 days
- Date posted
- Aug 27, 2026
- Source
- Open notice
Description
BI-JA-506-CMR, Hartford Correctional Center (CC) – Facility Roof Inspection/Replacement, 177 Weston Street, Hartford, CT 06120. DAS/CS is seeking the services of a highly talented and experienced Construction Manager to provide the following type of services in support of the above-reference Project. The Hartford Correctional Center is a secure 24/7 correction facility located at 177 Weston Street, Hartford, CT. The scope of work includes the replacement of all the existing roofing systems with a new EPDM roofing membrane system. The existing roofing systems are comprised of approximately 24,000 sq ft of built-up roofing, 21,000 sq ft of roll modified roofing, 90,000 sq ft of rubber/stone ballast roofing system, and 6,000 sq ft of glue down membrane across 21 buildings. A study performed by ARM Consultants, “Roof Inspection Report” dated 4/30/2024 will be provided to the shortlisted firms.
Classifications
- NAICS72000000
Documents (2)
- BI-JA-506-CMR 1700 CMR RFQ Web Advertisement 08.27.2026.pdfapplication/pdf231 KBNot yet available
- 1212 QBS Submittal Booklet Instructions 03.31.2026.pdfapplication/pdf301 KBNot yet available
Contacts
Similar contracts
- Heroes Tunnel Rehabilitation and Route 15 Interchange 46 ImprovementsCTDue Sep 24, 2026
- Rehabilitation of Bridge No. 00906 U.S. Rte. 202 over Shepaug River, WashingtonCTDue Sep 23, 2026
- Rehabilitation of Bridge No. 00906 U.S. Rte. 202 over Shepaug River, WashingtonCTDue Sep 23, 2026
- Installation & Revision of Traffic Control Signals in District 2CTDue Sep 23, 2026
- Rehabilitation of Bridge No. 00906 U.S. Rte. 202 over Shepaug River, WashingtonCTDue Sep 23, 2026
- Request for Qualifications for Architectural/Engineering ServicesCTDue Sep 22, 2026