ct_source38354
Open
Redding DPW Generator, Transfer Switch & Fuel System Replacement
- Response deadline
- Sep 3, 2026 Due in 2 days
- Date posted
- Aug 6, 2026
- Source
- Open notice
Description
The purpose of this project is to replace the Redding Department of Public Works generator system, transfer switch and fuel system to power the facility during times of lost utility power. Remove and dispose of existing equipment and fittings. Provide new 40kW generator with integrated 100 gallon diesel fuel cell and transfer switch, to be installed in the same location as the existing generator and transfer switch. Furnish and install all required equipment and fittings for installation of appliances. Test all systems for functionality and compliance with CT Building Code and Manufacturer’s Installation Instructions and Recommendations.
Classifications
- NAICS26111600
Documents (3)
- RFP - Redding DPW Generator and Transfer Switch 07-26-26.pdfapplication/pdf606 KBNot yet available
- BuyerChangeDetailsReport_38354_v1_Aug_25_26.pdfapplication/pdf2 KBNot yet available
- VendorChangeDetailsReport_38354_v1_Aug_25_26.pdfapplication/pdf2 KBNot yet available
Contacts
- sdonnelly@reddingct.gov203-938-2558
Similar contracts
- Redding DPW Generator, Transfer Switch & Fuel System ReplacementCTDue Aug 27, 2026
- IFB Reconfigure Generator and Switching SystemCADue Aug 20, 2026
- Emergency Generator Maintenance Services in Sacramento, CACADue Sep 8, 2026
- IFB 26-0009 - Generator Maintenance Services at the Truckee, Topaz, Long Valley, and Meyers Border Protection Stations (Nevada, Mono, Lassen, and El Dorado County)CADue Jul 15, 2026
- Mobile Generators + (DGS-OTA)CADue Jun 24, 2026
- IFB 25-0229: Generator Replacement Services in HawaiiCADue Jun 19, 2026