Civic AI
Civic AI
Procurement intelligence
ct_sourceUCHC4-222846533
Open

Prequalification: E Building Heat Pipe Replacement

Response deadline
Nov 17, 2026
Due in 14 days
Date posted
Oct 27, 2026

Description

UConn Health (UCH) will be replacing existing heating hot water piping with new throughout Building E on the Farmington UCH campus. This building houses 9 floors of research lab space. The carbon steel piping has degraded and failed on several occasions. There are 9 floors of piping to be removed and replaced between the riser and the terminal units. The building is occupied and work will be coordinated around tenants. Applicants must be pre-qualified by the Department of Administrative Services (DAS), for the Classification of GENERAL BUILDING CONSTRUCTION (GROUP C) or HVAC to participate in this Prequalification Application.

Classifications

Documents (2)

  • Prequalification Application_Proj_No_26-601.06.pdf
    application/pdf885 KBNot yet available
  • Contractor_Prequalification_Profile_Proj_No_26-601.06.xlsx
    application/vnd.openxmlformats-officedocument.spreadsheetml.sheet48 KBNot yet available

Contacts

Similar contracts

Explore more