ct_sourceEL-2027-001
Open
Niantic River Boardwalk Deck Replacement
- Response deadline
- Aug 20, 2026 Due in 26 days
- Date posted
- Jul 21, 2026
- Source
- Open notice
Description
The work consists of 558 LF of 10’ wide deck replacement at a boardwalk between Niantic River and Route 156. The Niantic River Boardwalk is approximately 586 LF with a portion of decking already replaced. The bid price shall include all equipment, tools, materials, hardware, traffic control, and labor incidental to the completion of this project. A Pre-Bid Site Meeting will occur on Thursday August 6, 2026 at 10 am the Cini Park (22 Main St. / Rt. 156). The Town reserves the right to disqualify any bid from a Contractor not represented at the Pre-Bid Site Meeting.
Classifications
- NAICS72000000
Documents (1)
- Niantic-River-Boardwalk-Decking-Bid-Package.pdfapplication/pdf22.8 MBNot yet available
Contacts
Similar contracts
- Heroes Tunnel Rehabilitation and Route 15 Interchange 46 ImprovementsCTDue Aug 26, 2026
- Invitation to Bid for Construction ServicesCTDue Sep 2, 2026
- Rental of Services and Equipment for Roadway ConstructionCTDue Aug 18, 2026
- Installation & Revision of Traffic Control Signals in District 1CTDue Aug 19, 2026
- Farmington Canal Heritage Trl. from Rt. 72 to Northwest Dr. in PlainvilleCTDue Jul 29, 2026
- Farmington Canal Heritage Trl. from Rt. 72 to Northwest Dr. in PlainvilleCTDue Jul 29, 2026