ct_sourceEE-26-011
Open
Discovery Drive Solar Array Pilot
- Response deadline
- Jul 16, 2026 Closed
- Date posted
- Jun 24, 2026
- Source
- Open notice
Description
This pilot project includes the installation of a 550 kWAC ground mount fixed tilt solar array at the site of Parcel 8.23.1-4 on Discovery Drive in Mansfield, CT (pilot system installed on 8.23.1-4 will be on one acre only). The proposed system includes the installation of the array, and all required related systems up to the point of interconnection. This project may delegate certain design responsibilities to the awarded Contractor. Contractor will be required to provide certification, signed and sealed by the responsible design professional, for each product and/or system specifically assigned to the Contractor to be designed.
Classifications
- NAICS72000000
Documents (1)
- EE26-011 Discovery Drive Solar Array Pilot - Construction RFQ SIS.pdfapplication/pdf834 KBNot yet available
Similar contracts
- Restroom Partition Replacement and Installation ServicesCTDue Sep 22, 2026
- Spot Improvements on River Street (Route 313) in the Town of SeymourCTDue Sep 16, 2026
- Spot Improvements on River Street (Route 313) in the Town of SeymourCTDue Sep 16, 2026
- Spot Improvements on River Street (Route 313) in the Town of SeymourCTDue Sep 16, 2026
- Spot Improvements on River Street (Route 313) in the Town of SeymourCTDue Sep 16, 2026
- Town of Suffield - New Sidewalk along Mapleton AvenueCTDue Sep 8, 2026