Civic AI
Civic AI
Procurement intelligence
ct_source39202
Open

Cromwell Fire District - Water Interconnection Project

Response deadline
Nov 6, 2026
Due in 28 days
Date posted
Sep 29, 2026

Description

The installation of two interconnection stations to connect the Cromwell Fire District, Water Division system to neighboring public water systems. Work includes but is not necessarily limited to the installation of subgrade concrete foundation; furnishing and installing the prefabricated bodies of two interconnection stations; installing approximately 2,060-feet of inch ductile iron water main via open trench; hanging approximately 170 feet of insulated 12-inch ductile iron water main at a bridge crossing and structural appurtenances; water main connections; gate valves; hydrants; backfill material; CTDOT road restoration; surface restoration; loaming and seeding; and all necessary and incidental appurtenances to complete the installation. Electronic Bids for the Emergency Interconnections Project, Cromwell, CT, project will be received until 12:00 PM prevailing time on Friday, November 6, 2026. All bids shall be submi

Classifications

Documents (6)

  • Sept 22 2026_Cromwell IC_Project Plans.pdf
    application/pdf27.6 MBNot yet available
  • Sept 22 2026 App J East Street Connection.pdf
    application/pdf279 KBNot yet available
  • Sept 22 2026_Cromwell IC_ProjectManual.pdf
    application/pdf15.9 MBNot yet available
  • HeavyRates_7-1-2026.pdf
    application/pdf1.7 MBNot yet available
  • BuyerChangeDetailsReport_39202_v1_Sep_29_26.pdf
    application/pdf2 KBNot yet available
  • VendorChangeDetailsReport_39202_v1_Sep_29_26.pdf
    application/pdf2 KBNot yet available

Contacts

Similar contracts

Explore more