ct_source37864
Open
Central Connecticut Loop Trail (CCLT) Design
State of CT - DAS Procurement · CT
- Response deadline
- Aug 7, 2026 Due in 20 days
- Date posted
- Jul 8, 2026
- Source
- Open notice
Description
The Lower Connecticut River Valley Council of Governments (RiverCOG) is seeking a qualified consulting firm to begin design and engineering of the preferred alternative from the Central Connecticut Loop Trail (CCLT) Study. The Study, completed in 2025, is a trail feasibility study to link the Farmington Canal Heritage Trail (FCHT) with the Air Line Trail (ALT). The roughly 23-mile route is a critical gap within the CCLT, a vision for a 111-mile loop trail running through 22 cities and towns in the center of Connecticut. View RFQ at https://www.rivercog.org/publicnotices
Classifications
- NAICS81101523
Documents (1)
- RiverCOGMT UAG RFQ.pdfapplication/pdf261 KBNot yet available
Contacts
- Vicki Harris