Civic AI
Civic AI
Procurement intelligence
ct_source37864
Open

Central Connecticut Loop Trail (CCLT) Design

State of CT - DAS Procurement · CT
Response deadline
Aug 7, 2026
Due in 20 days
Date posted
Jul 8, 2026

Description

The Lower Connecticut River Valley Council of Governments (RiverCOG) is seeking a qualified consulting firm to begin design and engineering of the preferred alternative from the Central Connecticut Loop Trail (CCLT) Study. The Study, completed in 2025, is a trail feasibility study to link the Farmington Canal Heritage Trail (FCHT) with the Air Line Trail (ALT). The roughly 23-mile route is a critical gap within the CCLT, a vision for a 111-mile loop trail running through 22 cities and towns in the center of Connecticut. View RFQ at https://www.rivercog.org/publicnotices

Classifications

Documents (1)

  • RiverCOGMT UAG RFQ.pdf
    application/pdf261 KBNot yet available

Contacts

Explore more