Annual Servicing of Navigational Aids and Dock Floats
- Response deadline
- Sep 24, 2026 Closed
- Date posted
- Sep 3, 2026
- Source
- Open notice
Description
The bid is to remove, store, inspect and provide a report with needed repairs and cost to repair (cost to repair not included in bid) and install in proper location in the Spring. Navigational Aids: Anchorage buoys — 10 buoys from Main Anchorage (A – K, excluding C), 2 buoys from Meadows Anchorage (A & B) and 1 Rock buoy located northwest of Brockway, and one No Wake buoy at the southern entrance to North Cove. Channel markers — 11 in North Cove. Install two buoys at the entrance to South Cove. Floats — Town Dock at Main Street, Mack Lane and Town Park (ramps for Mack Lane and Town Park to be stored with floats). The Mack Lane dock to be removed for the winter. Rock markers: • Remove the marker by the rocks on the northwest side of Brockway Island and install in the spring. Navigational aids and buoys shall be set according to directive of onboard EHMC representative. Removal to be performed on or after November 15, 2026 and completed by November 30, 2026.
Classifications
- NAICS78141700
Documents (1)
- Harbor Commission Navigational Aids and Dock 09 01 26.pdfapplication/pdf392 KBNot yet available
Contacts
- mlucarelli@essexct.gov860-767-4340
Similar contracts
- Commissioning Services - Highcrest Elementary SchoolCTDue Jul 10, 2026
- Fairfield Police Department Interior RenovationsCTDue Jul 23, 2026
- Town of Roxbury RFP Legal CounselCTDue Jul 23, 2026
- Florence S. Lord Senior Housing RenovationsCTDue Aug 6, 2026
- Procurement of Modernization & Dev. Cons. and Grant Administration ServicesCTDue Jul 8, 2026
- Striping Services at Montauk Ave. and Maple AveCTDue Jul 10, 2026