GAOA LDV Crystal Lakes Water & Septic Resuscitation, PSICC, Colorado
- Response deadline
- Sep 15, 2026 Closed
- Date posted
- Aug 7, 2026
- Source
- Open notice
Description
This project involves installing a new 2-inch HDPE waterline beneath Colorado Highway 24, including completing all Subsurface Utility Engineering required for CDOT permitting. Work includes connecting the new waterline from Dwelling 1 to the existing distribution system, replacing the well pump to provide a 15 GPM supply, installing a dual‑stage booster pump and basement water storage, and performing associated electrical upgrades such as relocating meters, burying service lines, upgrading panels, and supporting septic and booster pump systems. The project also replaces multiple septic systems serving the Blue House, Brown House, Bunkhouse, and Shop, installs new sewer and dosing infrastructure, and includes asphalt removal along with new road and gate installation.
Classifications
Documents (12)
- DownloadC04k Attachment 11 General Decision CO20260003 05182026.pdf.pdf1.9 MB
- DownloadC04j Attachment 10 RFI Form 1240LT26Q0107.docx.docx29 KB
- DownloadC04f Attachment 6 Test Pits 1240LT26Q0107.pdf.pdf2.9 MB
- DownloadC04b Attachment 2 SOW 1240LT26Q0107.docx.docx65 KB
- DownloadC04a Attachment 1 SOI 1240LT26Q0107.xlsx.xlsx14 KB
- DownloadC04e Attachment 5 Site Map 1240LT26Q0107.pdf.pdf998 KB
- DownloadC04h Attachment 8 Well Permit Number 268119 1240LT26Q0107.pdf.pdf47 KB
- DownloadC04g Attachment 7 Well Permit Number 117217 1240LT26Q0107.pdf.pdf315 KB
- DownloadC04d Attachment 4 Project Manual 1240LT26Q0107.pdf.pdf1.1 MB
- DownloadC04 SF1442 1240LT26Q0107.pdf.pdf304 KB
- DownloadC04c Attachment 3 Drawings 1240LT26Q0107.pdf.pdf7.4 MB
- DownloadC04i Attachment 9 Site Visit Plan 1240LT26Q0107.docx.docx3.8 MB
Contacts
Similar contracts
- Sewage Ejector and Line AssessmentDue Oct 28, 2026
- Y--Rehabilitation of Water and Wastewater SystemDue Oct 7, 2026
- Y--HAVO 326181 Rehabilitate Rainshed&Water TreatmentDue Oct 23, 2026
- East Canal Efficiency ImprovementsDue Nov 20, 2026
- Y--Gray Wall Livestock Water WellDue Oct 26, 2026
- MSD Infrastructure Repairs Phase 2