Civic AI
Civic AI
Procurement intelligence
SAM.gov1240LT26Q0107
Open

GAOA LDV Crystal Lakes Water & Septic Resuscitation, PSICC, Colorado

Response deadline
Sep 15, 2026
Closed
Date posted
Aug 7, 2026

Description

This project involves installing a new 2-inch HDPE waterline beneath Colorado Highway 24, including completing all Subsurface Utility Engineering required for CDOT permitting. Work includes connecting the new waterline from Dwelling 1 to the existing distribution system, replacing the well pump to provide a 15 GPM supply, installing a dual‑stage booster pump and basement water storage, and performing associated electrical upgrades such as relocating meters, burying service lines, upgrading panels, and supporting septic and booster pump systems. The project also replaces multiple septic systems serving the Blue House, Brown House, Bunkhouse, and Shop, installs new sewer and dosing infrastructure, and includes asphalt removal along with new road and gate installation.

Classifications

Documents (12)

  • C04k Attachment 11 General Decision CO20260003 05182026.pdf
    .pdf1.9 MB
    Download
  • C04j Attachment 10 RFI Form 1240LT26Q0107.docx
    .docx29 KB
    Download
  • C04f Attachment 6 Test Pits 1240LT26Q0107.pdf
    .pdf2.9 MB
    Download
  • C04b Attachment 2 SOW 1240LT26Q0107.docx
    .docx65 KB
    Download
  • C04a Attachment 1 SOI 1240LT26Q0107.xlsx
    .xlsx14 KB
    Download
  • C04e Attachment 5 Site Map 1240LT26Q0107.pdf
    .pdf998 KB
    Download
  • C04h Attachment 8 Well Permit Number 268119 1240LT26Q0107.pdf
    .pdf47 KB
    Download
  • C04g Attachment 7 Well Permit Number 117217 1240LT26Q0107.pdf
    .pdf315 KB
    Download
  • C04d Attachment 4 Project Manual 1240LT26Q0107.pdf
    .pdf1.1 MB
    Download
  • C04 SF1442 1240LT26Q0107.pdf
    .pdf304 KB
    Download
  • C04c Attachment 3 Drawings 1240LT26Q0107.pdf
    .pdf7.4 MB
    Download
  • C04i Attachment 9 Site Visit Plan 1240LT26Q0107.docx
    .docx3.8 MB
    Download

Contacts

Similar contracts

Explore more