USCGC Stratton Shaft Alignment and Bearing Reaction Check
- Response deadline
- Sep 21, 2026 Due in 7 days
- Date posted
- Sep 14, 2026
- Source
- Open notice
Description
Statement of Work CGC Stratton Shaft Alignment and Bearing Reaction Check Intent: contractor must measure and report to USCG the Vertical and Horizontal Loads on the (2) bull gear bearings and (2) intermediate bearings, stern and strut bearings, using the Strain Gage Method. Period of Performance: 01 November 2026 – 01 January 2027 Location: USCGC Stratton, 42 Eagle Road Coast Guard Island, Alameda CA 94501 Contractor will install a total of (5) full bridge strain gage sets on the Port shaft, and (5) strain gage sets on the Starboard shaft, to complete the bearing load calculations. Contractor will also measure and report the vertical load on each line shaft bearing using the Hydraulic Jack/Load Cell method. Contractor will provide all specialty tools and calibrated instrumentation necessary to install the strain gages and measure the strain gage data. Contractor shall provide a final written report within 15 days after completion of the work covered by this scope of work. The report shall contain at a minimum the following: Introduction and References Project description Alignment calculations Alignment tests with strain gages Conclusions Recommendation for future action Data sheets on shaft model used to obtain reported results e.g. stations, strain gauge locations, diameters, lengths, load points, etc. Data sheets from Computer runs that computed reported results e.g. stations, deflections, stresses, bearing reactions, slopes, etc. References: Coast Guard Drawings Coast Guard Drawing 750 WMSL 114-001, Rev B, Fairwaters and Rope Guard Installation Details & L/M (ASC114001) Coast Guard Drawing 750 WMSL 243-007, Rev E, Propulsion Shafting System Arrangement (ASC243008) Coast Guard Drawing 750 WMSL 243-008, Rev -, Propulsion Shafting and Appendage (ASC243001B) Coast Guard Drawing 750 WMSL 244-001, Rev -, Propulsion Shafting System Measured Bearing Reaction Report (ASC244001) Coast Guard Drawing 750 WMSL 244-002, Rev B, Stern Tube Seal & Strut Bearings Arrangement & Details & L/M (ASC244002) Coast Guard Drawing 750 WMSL 244-003, Rev -, Propulsion Shafting System Measured Bearing Reaction Report (AS2244001 Notes: For any references to be distributed, the contractor must be registered in the Joint Certification Program (JCP) through Defense Logistics Agency (DLA) and provide your JCP number to the listed point of contact for this work. For questions regarding this statement of work, contact LTJG Maximos Brady maximos.h.brady@uscg.mil
Classifications
Documents (1)
- CGC Stratton SOW Shaft Alignment 26042.pdf.pdf73 KBNot yet available
Contacts
Similar contracts
- Roush Lake Elevator RepairsDue Sep 21, 2026
- Industrial Fan Maintenance and Repair ServicesMarylandDue Sep 21, 2026
- Fire Extinguisher ServiceGeorgiaDue Sep 21, 2026
- Replace Substation Alpha Relay B11912 Amendment 0002TexasDue Sep 18, 2026
- Notice of Intent for Material Handling Equipment (MHE) maintenance and repair serviceTexasDue Sep 25, 2026
- Exhibit Preventative Maintenance and Ad Hoc Repairs at the National Archives MuseumDistrict of Columbia