127EAW26Q0037 - Dark Canyon Culvert Repair
- Response deadline
- Aug 25, 2026 Due in 10 days
- Date posted
- Jul 30, 2026
- Source
- Open notice
Description
127EAW26Q0037 - Dark Canyon Culvert Repair: A00001 - Road Use Permit The purpose of this amendment is to post and an extended road use permit to 25 August 2026. Attached is "DARK_CANYON_FS_7700_48 Road Use Permit_SIGNED" which is hereby incorporated into any subsequent contract award. Failure to use the revised documents and requirements revised within will result in your proposal being non-responsive. ///////////////////////////////////////////////////////////////////////////////////////////// 127EAW26Q0037 - Dark Canyon Culvert Repair Set Aside: Total Small Business Set Aside IMPORTANT NOTES: - See Section "Required Quote Submission Documents" for the Documents to Submit with Your Proposal - An organized site visit will NOT be held. See page 13 for complete site access details. - Requests For Information (RFI’s) are required to be submitted on attachment “RFI Form” and are due to the Contracting Officer (Gregory.Cunningham@usda.gov) via email no later than August 14th, 2026, 10:00 AM Pacific Time. No questions will be accepted after this date and time. - All quotes shall be emailed to the Contracting Officer (Gregory.Cunningham@usda.gov) no later than August 25th, 2026, 10:00 AM Pacific Time.
Classifications
Documents (13)
- Download3. Dark Canyon Drawings (07-23-26).pdf.pdf3.0 MB
- Download2. Schedule of Items.docx.docx18 KB
- Download5. Wild-Mad Road Closure Map.pdf.pdf1.5 MB
- Download4. Dark Canyon Specs (07-23-26).pdf.pdf6.5 MB
- DownloadA00001 - Road Use Permit.pdf.pdf273 KB
- Download9. Davis-Bacon Act WD # CA20260007 – 18 May 2026.pdf.pdf174 KB
- Download1. Statement of Work.pdf.pdf367 KB
- Download127EAW26Q0037 - Dark Canyon Culvert Repair.pdf.pdf590 KB
- Download6. Fire Plan.pdf.pdf339 KB
- DownloadDARK_CANYON_FS_7700_48 Road Use Permit_SIGNED.pdf.pdf252 KB
- Download8. Contract Administration Information.pdf.pdf278 KB
- Download10. RFI Form.xlsx.xlsx13 KB
- Download7. Wild Mad_DARK_CANYON_FS_7700_48 Road Use Permit_Signed.pdf.pdf197 KB
Contacts
Similar contracts
- FY26 MOTSU BermsDue Aug 24, 2026
- TIMPAS PICNIC AREA SITE IMPROVEMENT PROJECTColoradoDue Aug 25, 2026
- Q4 FY26 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MDDue Sep 1, 2026
- RICHMOND INNER HARBOR FY26 MAINTENANCE DREDGING PROJECT Due Aug 28, 2026
- Calcasieu River and Pass, LA, Dredged Material Management Plan (DMMP), CDF-12A Degrading, Calcasieu Parish, LALouisianaDue Aug 21, 2026
- Thomas J. O Brien (TJO) Embankment RepairDue Sep 14, 2026