Civic AI
Civic AI
Procurement intelligence
OpenGov / IonwaveIFB No. PW-0327
Open

West Cliff Dr Path Realignment

Response deadline
Sep 24, 2026
Due in 19 days
Date posted
Sep 4, 2026

Description

The project includes improvements at two sites to enhance pedestrian access, drainage, site amenities, and overall safety. At Site 1, the proposed improvements include demolition and repaving of a portion of the existing path, removal of deteriorated path segments, construction of a wood split rail fence with gate, and installation of decomposed granite rest areas with benches and memorials. Drainage improvements include construction of a swale and connection of a new catch basin to the existing storm drain system. Additional improvements include installation of a hose bib and box, vegetation restoration with a rock swash, and associated grading. At Site 2, improvements include removal of the existing parking area and a portion of the existing asphalt pathway, repurposing of an existing storm drain catch basin, and construction of a new asphalt-paved path. A decomposed granite rest area with a park bench and trash receptacle will also be installed, along with a new swale, associated grading, vegetation restoration, and other related improvements necessary to complete the project.

Documents

No documents posted for this opportunity.

Similar contracts

Explore more