West Cliff Dr Path Realignment
- Response deadline
- Sep 24, 2026 Due in 19 days
- Date posted
- Sep 4, 2026
- Source
- Open notice
Description
The project includes improvements at two sites to enhance pedestrian access, drainage, site amenities, and overall safety. At Site 1, the proposed improvements include demolition and repaving of a portion of the existing path, removal of deteriorated path segments, construction of a wood split rail fence with gate, and installation of decomposed granite rest areas with benches and memorials. Drainage improvements include construction of a swale and connection of a new catch basin to the existing storm drain system. Additional improvements include installation of a hose bib and box, vegetation restoration with a rock swash, and associated grading. At Site 2, improvements include removal of the existing parking area and a portion of the existing asphalt pathway, repurposing of an existing storm drain catch basin, and construction of a new asphalt-paved path. A decomposed granite rest area with a park bench and trash receptacle will also be installed, along with a new swale, associated grading, vegetation restoration, and other related improvements necessary to complete the project.
Documents
No documents posted for this opportunity.
Similar contracts
- Soquel Corridor Safety ProjectCADue Sep 8, 2026
- Hsip Cycle 11 & 12: Unsignalized Crossing Improvement ProjectCADue Sep 24, 2026
- Environmental Consulting for Pump Station 1 and Soquel Pump StationCADue Sep 26, 2026
- MRF Paving and Stormwater ImprovementsCADue Sep 2, 2026
- Metro Rapid Corridors - Pavement Treatment SelectionCADue Jul 29, 2026
- School Street Staircase RenovationCADue Jul 28, 2026