OpenGov / IonwaveIFB No. PW-0332
Open
Hsip 11 & 12: Unsignalized Crossing Improvement Project
- Response deadline
- Nov 5, 2026 Due in 14 days
- Date posted
- Oct 21, 2026
- Source
- Open notice
Description
The Project to be performed consists of furnishing all labor, materials, tools, equipment, and transportation required to complete the Project, with a scope of work to generally include, but is not limited to, the following: Installing concrete curbs, gutters, sidewalk, curb ramps, roadway signs, pedestrian activated beacons and striping and pavement markings. All other work not mentioned above that is required by the plans, City Standard Specifications, State Standard Specifications and the Special Provisions shall be performed, placed, constructed or installed
Documents
No documents posted for this opportunity.
Similar contracts
- West Cliff Dr Path RealignmentCADue Sep 24, 2026
- Soquel Corridor Safety ProjectCADue Sep 8, 2026
- Hsip Cycle 11 & 12: Unsignalized Crossing Improvement ProjectCADue Sep 24, 2026
- Environmental Consulting for Pump Station 1 and Soquel Pump StationCADue Oct 3, 2026
- MRF Paving and Stormwater ImprovementsCADue Sep 2, 2026
- Metro Rapid Corridors - Pavement Treatment SelectionCADue Jul 29, 2026