OpenGov / Ionwave2023/2024-22
Open
Water Mainline Replacements Project (CI 5493)
- Response deadline
- Jul 1, 2026 Closed
- Date posted
- May 22, 2026
- Source
- Open notice
Description
The work consists of furnishing all labor, materials, tools, equipment, and incidentals as required by the plans (Drawing Number 24-008A, Sheets 1-18) Specifications, and Contract Documents. The general items of work include replacement of existing, focused lengths of waterlines at five different locations with larger diameter water main piping adjacent to Calleguas Municipal Water District turnout structures. The Project is located at five different locations within the City of Thousand Oaks. Locations are identified in the project plans.
Documents
No documents posted for this opportunity.
Similar contracts
- MI 2646 HCTP CCC Roof Caulking and FEB Joint CaulkingCADue Aug 12, 2026
- CI 5634 HCTP In-Plant Meter ReplacementCADue Aug 12, 2026