OpenGov / Ionwave2025/2026-34
Open
MI 2646 HCTP CCC Roof Caulking and FEB Joint Caulking
City of Thousand Oaks — Public Works · CA
- Response deadline
- Aug 12, 2026 Due in 24 days
- Date posted
- Jul 17, 2026
- Source
- Open notice
Description
The project is at the Hill Canyon Treatment Plant, 9600 Santa Rosa Road, Camarillo, CA 93012. The general items of work consists of removing all existing caulking in the concrete joints of the flow equalization basin (FEB) nd the existing expansion joint material in the roof joints of the concrete contact channel (if loose and faiiling), preparation of the existing substrate in accordance with the caulkign manufacturer's instructions or as required by the Engineer, installation of the required backer rod and bond breaker tape, installation of the required primer and caulking sealant, legal dispoal of construction waste, and cleanup.
Documents
No documents posted for this opportunity.