la_rampla230939
Open
TOS No. 25-005 - Phase II of Engine Company 23 Junior Arts Center for Professional Design & Construction Administration
- Response deadline
- Oct 2, 2026 Due in 1 day
- Date posted
- Jul 16, 2026
- Source
- Open notice
Description
The City of Los Angeles, Bureau of Engineering (BOE), Architectural Division is seeking a consultant to provide interior and exterior rehabilitation of an existing historical Fire Station for the development of a Junior Arts Center, including, but not limited to: architectural, civil, mechanical, electrical, plumbing, structural, bid support, historic preservation documentation, and construction administration services for all disciplines. *Any subconsultants that have been added to the contract and not originally a part of Schedule A must be registered with RAMP. **This TOS is only applicable to the firms on the 2025 Pre-Qualified On-Call Architectural and Related Professional Services Consultants List - Tier 1 and Tier 2.
Classifications
- NAICS541310
- PSCPersonal Services
Documents (31)
- Attachment No. 1 - Pre-Design Report.pdfPDF10.5 MBNot yet available
- Attachment No. 2 - Schedule B Task Work Order List of Subconsultants.xlsEXCEL49 KBNot yet available
- Attachment No. 3 - Non-Collusion Affidavit.pdfPDF10 KBNot yet available
- TOS No. 25-005 - Phase II of Engine Company 23 Junior Arts Center for Professional Design & Construction Administration.pdfPDF674 KBNot yet available
- Attachment No. 7 - Holmes Fire Proposal.pdfPDF182 KBNot yet available
- Attachment No. 9b - CIVIL - Phase I Record Drawings.pdfPDF1.8 MBNot yet available
- Attachment No. 9c - ELECTRICAL - Phase I Record Drawings.pdfPDF9.6 MBNot yet available
- Attachment No. 5a - Structural Calculations Package.pdfPDF12.2 MBNot yet available
- Attachment No. 5b - Structural Calculations - Load Assumptions.pdfPDF104 KBNot yet available
- Attachment No. 9e - STRUCTURAL - Phase I Record Drawings.pdfPDF8.1 MBNot yet available
- Attachment No. 8b - LVNOC Meeting No. 3 - Meeting Minutes.docxWORD_X56 KBNot yet available
- Attachment No. 9a - ARCHITECTURAL - Phase I Record Drawings.pdfPDF50.0 MBNot yet available
- Attachment No. 4e - OHR Meeting Minutes (5-1-2018).pdfPDF22 KBNot yet available
- Attachment No. 9d - MECHANICAL & PLUMBING - Phase I Record Drawings.pdfPDF9.3 MBNot yet available
- Attachment No. 4b - OHR Meeting Minutes (6-9-2017).pdfPDF20 KBNot yet available
- Attachment No. 4a - OHR Meeting Minutes (1-19-2017).pdfPDF215 KBNot yet available
- Attachment No. 8a - LVNOC Meeting No. 2 - Meeting Minutes.docxWORD_X665 KBNot yet available
- Attachment No. 4c - OHR Meeting Minutes (6-19-2017).pdfPDF20 KBNot yet available
- Attachment No. 8c - LVNOC Meeting No. 4 - Presentation.pdfPDF4.4 MBNot yet available
- Addendum No. 1.pdfPDF488 KBNot yet available
- Attachment No. 4d - OHR Meeting Minutes (3-27-2018).pdfPDF302 KBNot yet available
- Attachment No. 6 - Subconsultant List for Phase I.docxWORD_X9 KBNot yet available
- Addendum No. 2.pdfPDF284 KBNot yet available
- Attachment No. 10 - Cantilevered Stage Shop Drawings (1-20-2021).pdfPDF4.2 MBNot yet available
- Attachment No. 11 - BIP Outreach Requirements (1-13-2023).pdfPDF1.2 MBNot yet available
- Attachment No. 14 – Add Subconsultant Info_PAC.xlsxEXCEL_X14 KBNot yet available
- Attachment No. 11 – Mini Outreach Process Flowchart.pdfPDF237 KBNot yet available
- Attachment No. 12 – Mini Outreach Checklist.docxWORD_X22 KBNot yet available
- Addendum No. 3.pdfPDF324 KBNot yet available
- Attachment No. 13 – Mini Outreach Phone Log.xlsxEXCEL_X512 KBNot yet available
- Addendum No. 4.pdfPDF277 KBNot yet available
Contacts
Similar contracts
- GSA A/E Short Selection Process for Conus/OconusDue Nov 1, 2026
- Architect and Engineering ServicesOhioDue Oct 22, 2026
- 674-19-101 Replace Boilers and Boiler Plant (CPS Only)Due Oct 14, 2026
- Architect and Engineering ServicesOhioDue Oct 22, 2026
- C--OSHA A/E Renovation Design and PhasingDCDue Oct 13, 2026
- Bridging Design for San Salvador New Office Building Chancery and Selective Compound ImprovementsNew York