P2660010: Domestic Water Treatment Plant Operations at Hot Creek Hatchery, Mono County, California
- Response deadline
- Jul 7, 2026 Closed
- Date posted
- 06/05/2026 8:00AM PDT
- Source
- Open notice
Description
The Contractor will provide to the California Department of Fish and Wildlife (CDFW): labor, materials, tools, equipment, and incidentals necessary for contractual operation and routine systems maintenance, inspection, data measurements and sample analysis, servicing and repairs of the Hot Creek Hatchery (HCH) domestic water system, in accordance with the specifications, terms, and conditions contained herein. All inspection and maintenance work will ensure that the equipment continues to function properly and safely. BID DUE DATE: July 7, 2026, no later than 2:00pm CSLB License Required: ¿ A- General Engineering Contractor, OR ¿ B ¿ General Building Contractor, OR ¿ C-36 Plumbing Contractor, OR ¿ C-55 Water Conditioning Contractor ADDITIONAL CERTIFICATIONS from the California State Water Resources Control Board required: ¿ Grade D2 Water Distribution or higher, AND ¿ Grade T2 Water Treatment or higher
Classifications
- UNSPSC47101500Water treatment & supply equipment
- UNSPSC83101506Public Utilities & Public Sector Related Srvcs - Utilities - Water & sewer - Water treatment services
Documents (4)
Contacts
- Edith Derheim