Civic AI
Civic AI
Procurement intelligence
la_rampla230902
Open

Central Business District (CBD) Sewer Rehabilitation Unit 12 - Alameda Street to 18th Street (Re-Bid)

Response deadline
Sep 2, 2026
Due in 18 days
Date posted
Jul 23, 2026

Description

The scope of work consists of rehabilitating approximately 6,387 feet an existing 40-inch circular brick sewer by Ultraviolet Cured In-Place Piping (UVCIPP). Most of the rehabilitation work is expected to be performed by access through existing maintenance holes. The scope of work also includes rehabilitation of 20 maintenance hole structures which include 4 junction structures, top 6-ft. of all maintenance holes shafts will be removed and reconstructed with 30-inch frames and covers. The project entails the cleaning, removal and disposal of the fallen bricks and other debris, preparing the sewer for UVCIPP liner installation, re-establishing lateral sewers and house connections. Temporary odor control, sewer bypass, and traffic control are also parts of the scope of work. ▬ ● See bid package for full scope & details ●● Bid package only on RAMPLA- download Part 1 to be a planholder ● For planholders lists & bid results visit: http://engineering.lacity.gov/contractors/

Classifications

Documents (6)

  • SZC13940_R_Info.pdf
    PDF134 KB
    Download
  • SZC13940_R_Bid_Pkg_Part_1.zip
    ZIP24.6 MB
    Download
  • SZC13940_R_Bid_Pkg_Part_2.zip
    ZIP50.0 MB
    Download
  • SZC13940_R_Bid_Pkg_Part_3.zip
    ZIP43.3 MB
    Download
  • SZC13940_Addendum_1.zip
    ZIP3.4 MBNot yet available
  • Addendum Version 1.pdf
    PDF16 KBNot yet available

Contacts

Similar contracts

Explore more