Central Business District (CBD) Sewer Rehabilitation Unit 12 - Alameda Street to 18th Street (Re-Bid)
- Response deadline
- Sep 2, 2026 Closed
- Date posted
- Jul 23, 2026
- Source
- Open notice
Description
The scope of work consists of rehabilitating approximately 6,387 feet an existing 40-inch circular brick sewer by Ultraviolet Cured In-Place Piping (UVCIPP). Most of the rehabilitation work is expected to be performed by access through existing maintenance holes. The scope of work also includes rehabilitation of 20 maintenance hole structures which include 4 junction structures, top 6-ft. of all maintenance holes shafts will be removed and reconstructed with 30-inch frames and covers. The project entails the cleaning, removal and disposal of the fallen bricks and other debris, preparing the sewer for UVCIPP liner installation, re-establishing lateral sewers and house connections. Temporary odor control, sewer bypass, and traffic control are also parts of the scope of work. ▬ ● See bid package for full scope & details ●● Bid package only on RAMPLA- download Part 1 to be a planholder ● For planholders lists & bid results visit: http://engineering.lacity.gov/contractors/
Classifications
- NAICS237110
- PSCConstruction
Documents (6)
Contacts
Similar contracts
- Sewage Ejector and Line AssessmentDue Oct 28, 2026
- Y--Rehabilitation of Water and Wastewater SystemDue Oct 7, 2026
- Y--HAVO 326181 Rehabilitate Rainshed&Water TreatmentDue Oct 23, 2026
- East Canal Efficiency ImprovementsDue Nov 20, 2026
- Y--Gray Wall Livestock Water WellDue Oct 26, 2026
- MSD Infrastructure Repairs Phase 2