2026 Citywide Pavement Preservation and Maintenance Project
- Response deadline
- Sep 10, 2026 Due in 36 days
- Date posted
- Aug 5, 2026
- Source
- Open notice
Description
The proposed pavement preservation and maintenance project includes Type II Slurry Seal, Single-Layer Fiber Microsurfacing (MSE), and Double-Layer Fiber Microsurfacing (MSE) treatments on existing roadway segments located within the southeastern portion of the City of Victorville. The project encompasses selected streets within residential, commercial, industrial, and institutional areas generally situated South of Nisqualli Road and North of Bear Valley Road, East of 7th Avnue and West of Spring Valley Parkway as shown in the figure provided herein. In addition, the project includes treatment for parking lots at four (4) local parks, including: Doris Davies Park, Grady Trammel Park, Hook Park, and Village Park. As part of the project, existing pavement markings will be refreshed throughout the project area, including the replacement of stop legends and white limit lines at intersections. In addition, more comprehensive striping and signage improvements are proposed along Burwood Avenue, Fifth Avenue, Highgate Avenue, Huerta Street, Jasmine Street, Minnetonka Street, Pahute Avenue, Second Avenue, Sitting Bull Street, Sixth Avenue, and Tamarisk Road. These improvements may include the installation or replacement of lane lines, channelization markings, directional arrows, school crossing markings, regulatory signs, and other traffic control devices intended to enhance visibility, improve roadway safety, and maintain compliance with current standards.
Documents
No documents posted for this opportunity.
Similar contracts
- Turnout 5 ProjectCADue Aug 5, 2026
- Project Initiation Documents for the Eucalyptus Street Extension over the Oro Grande WashCADue Jul 16, 2026
- 1MG SCLA Reclaimed Water Reservoir 2CADue Jul 9, 2026