OpenGov / Ionwave270146
Open
Silverbell Road Roadway Improvements - El Camino del Cerro to Goret Road
- Response deadline
- Sep 21, 2026 Closed
- Date posted
- Aug 19, 2026
- Source
- Open notice
Description
The project consists of a total of 3.27 miles of road improvements including 2.63 miles of Silverbell Rd., from 0.25 miles north of El Camino Del Cerro to 0.2 miles north of Goret Rd., 0.50 mile of El Camino Del Cerro, and 0.14 mile of Sweetwater Dr. The construction consists of four lanes of roadway with medians, curbs, sidewalks, multi-use path, traffic signals, street lighting, landscaping and irrigation, utility work and drainage facilities.
Documents
No documents posted for this opportunity.
Similar contracts
- Transit Account and Passenger System (TAPS)AZDue Nov 30, 2026
- Sahuara and Copper/Flower Bicycle Boulevards - FHWAAZDue Nov 3, 2026
- On-Call Geotechnical Engineering & Materials Testing ServicesAZDue Sep 10, 2026
- Traffic Signal & Street Lighting PolesAZDue Aug 18, 2026
- Blacklidge Drive Bicycle Boulevard- FHWAAZDue Aug 10, 2026
- HSIP Three Signalized Intersections, Tucson - FHWAAZDue Jul 22, 2026