OpenGov / Ionwave2026-0703
Open
Burn Tower and Installation at Fire Training Facility
- Response deadline
- Jul 2, 2026 Closed
- Date posted
- Jun 2, 2026
- Source
- Open notice
Description
The burn tower shall simulate a three-level, single and multi-family residential structure with an attached four-story interior stairwell, built using shipping containers. The vendor shall provide all materials, transportation, labor, assembly, painting, and commissioning of the structure. The project must be delivered and installed at the designated site within by July 31, 2027.
Documents
No documents posted for this opportunity.
Similar contracts
- RFQ-Survey Modeling, Design & Engineering ServicesALDue Sep 4, 2026
- Renovation for Orange Beach Medical Center SouthALDue Aug 27, 2026
- Life Support Systems and Equipment for Coastal Alabama Sea Turtle FacilityALDue Jul 16, 2026
- Exotic Invasive Plant Species Removal, Native Landscaping, Monitoring and EducationALDue Jul 2, 2026
- Work Skiff (Coastal Resources)ALDue Jul 2, 2026