SAM.gov36C24526Q0756
Open
1945--PERRY POINT EZ DOCK "BRAND NAME ONLY" OEM LETTER FROM THE MANUFACTURER IS REQUIRED. IF NO OEM LETTER VENDOR WILL BE CONSIDERED NON-RESPONSIVE.
- Response deadline
- Aug 12, 2026 Due in 4 days
- Date posted
- Aug 7, 2026
- Source
- Open notice
Similar contracts
- TDA Auxiliary Water Supply (AWS) Backup Debris ManagementDue Aug 24, 2026
- FY27 Maintenance Dredging, South Atlantic Division Regional Harbor Dredge ContractDue Aug 18, 2026
- Z--Folsom Dam Vessel Exclusion Barrier and Debris BooDue Aug 31, 2026
- HALEIWA SMALL BOAT HARBOR MAINTENANCE DREDGING AND REVETTED MOLE REPAIR, HALEIWA, OAHU, HAWAIIDue Oct 8, 2026
- Y--NOAA/USCG Cutter STORIS Homeporting ProjectDue Sep 1, 2026
- Design-Bid-Build, Dredging at JEBLC Fuel Pier and Anzio Beach Sandbar, and JEBFS Utah Beach Sandbar, Joint Expeditionary Base Little Creek - Fort Story, Virginia Beach, VADue Sep 1, 2026