nc_evpNCWAKE-TECHNICAL-COMMUNITY-COLLEGE---CONSTRUCTION
WAKE TECHNICAL COMMUNITY COLLEGE - CONSTRUCTION / Project 3051 Southern Wake Campus Renovations - Building SL
5 open solicitations
Linked solicitations
- Design Consulting Services - Renovations to Building L Student Services - 105,669 sf 3-story building housing general student services, advising, classrooms, culinary training, student lounge w/ fo…open1006Bid #130-WTCC9227CNCDue Sep 11, 2026
- Renovation of two existing buildings on the RTP campus to incorporate the Biotech Capstone RTP. Renovation to include the existing clean room to accommodate a real-world aseptic lab as well as a pl…open1006Bid # 130-WTCC9226CNCDue Aug 31, 2026
- Construction Materials Testing and Special Inspection services for Conlon Western Wake Phase 1 in Apex, NC.
Included in Phase 1 will be site development, infrastructure installation, and the constr…open1006Bid #130-WTCC9225CNCDue Jul 29, 2026
- Professional Commissioning Agent (CxA) services for construction commissioning for the replacement of outdoor air-cooled chillers at the Southern Wake Campus (3 locations) and the Perry Health Scie…open1006Bid # 130-WTCC9224CNCDue Jun 30, 2026
- The scope of this project will include full design and construction administration services for the modernization of the two passenger elevators in Building HA on the Perry Health Sciences Campus. …open1006Bid # 130-WTCC9223CNCDue Jun 30, 2026