Office Engineer
California eProcure · CA
Contact
- occa@dot.ca.gov
- Phone
- 916/227-6299
- Title
- —
- Type
- primary
Open solicitations
- Cold plane AC pavement and HMA (Type A)California eProcureCADue Sep 22, 2026
- Pedestrian hybrid beacon system and curb rampCalifornia eProcureCADue Sep 9, 2026
- Construct JPCP, HMA, drainage Sys, sign structures, and Elect SysCalifornia eProcureCADue Oct 6, 2026
- Const bridges, RW, SW, pavement, drainage and electrical systemsCalifornia eProcureCADue Oct 8, 2026
- Roadway excavation, HMA, and modifying lighting systemsCalifornia eProcureCADue Sep 23, 2026
- Roadway excavation and hot mix asphalt (Type A)California eProcureCADue Oct 6, 2026
- Earthwork, construct soldier pile walls, & place new roadway sectionCalifornia eProcureCADue Oct 7, 2026
- Place bridge scour protectionCalifornia eProcureCADue Sep 22, 2026
- Concrete barrier, crash cushion, & rock slope protectionCalifornia eProcureCADue Sep 10, 2026
- Construct bridge, Aux lanes, Geo Reinf Emb, rock Exc, Elect, landscapeCalifornia eProcureCADue Oct 1, 2026
- Cold plane, RHMA-G, SAMI, drainage, curb ramps, and electricalCalifornia eProcureCADue Oct 22, 2026
- HMA, RHMA, imported borrow, clearing & grubbing, and lighting systemCalifornia eProcureCADue Sep 9, 2026
- Replace drainage, Elect systems, and guardrail with Conc barrierCalifornia eProcureCADue Sep 24, 2026
- HMA, Cl 2 AB, Rdwy Exc, Conc barrier and sign structuresCalifornia eProcureCADue Sep 9, 2026
- Place micro-surfacing and replace asphalt concrete surfacingCalifornia eProcureCADue Sep 1, 2026
- Construct pedestrian and bike lane, curb ramps and lighting systemsCalifornia eProcureCADue Sep 10, 2026
- Install wildlife exclusionary fencing and outriggersCalifornia eProcureCADue Aug 6, 2026
- Methacrylate, polyester overlay, joint seal repair and spall repairCalifornia eProcureCADue Aug 25, 2026
- Install anchored double twisted wire mesh system and erosion controlCalifornia eProcureCADue Aug 25, 2026
- Construct retaining wall, MGS, cold plane & Pvmt wideningCalifornia eProcureCADue Sep 2, 2026
- Install trash capture devices, construct maintenance vehicle pulloutsCalifornia eProcureCADue Sep 1, 2026
- HMA (Type A), minor Conc, modify signal, and Ped hybrid beaconCalifornia eProcureCADue Sep 2, 2026
- Trash capture devices, MVPs, MGS, erosion control, and Mod lightingCalifornia eProcureCADue Sep 17, 2026
- Install drainage systems and Pvmt delineation, construct drivewayCalifornia eProcureCADue Aug 27, 2026
- Construct maintenance facilitiesCalifornia eProcureCADue Aug 27, 2026
- Construct acceleration lanesCalifornia eProcureCADue Aug 25, 2026
- Install high friction surface treatmentCalifornia eProcureCADue Aug 4, 2026
- Rdwy Exc, HMA, RHMA, Cl 2 AB, Conc. & Temp barrier, and mobilizationCalifornia eProcureCADue Sep 3, 2026
- Construct Conc barrier & MGS, install striping and signingCalifornia eProcureCADue Aug 18, 2026
- Reduce the number of crossing and left-turn movementsCalifornia eProcureCADue Aug 11, 2026
- Signal and lighting systemCalifornia eProcureCADue Jul 21, 2026
- Realign horizontal curveCalifornia eProcureCADue Jul 29, 2026
- Pavement repair, drainage, MGS, Mod lighting systems and TMSCalifornia eProcureCADue Aug 4, 2026
- Install high tension cable, place HMA, landscape, and electricalCalifornia eProcureCADue Jul 23, 2026
- Replace bridge fender system and skirt modificationCalifornia eProcureCADue Aug 5, 2026
- Cold plane, HMA, sidewalk, curb ramp, landscape, and drainage workCalifornia eProcureCADue Jul 14, 2026
- Roadway excavation, JPCP, HMA-A, & modifying TMSCalifornia eProcureCADue Jul 22, 2026
- Construct roundaboutCalifornia eProcureCADue Jul 7, 2026
- Bridge replacement and roadway wideningCalifornia eProcureCADue Jul 23, 2026