Kei Akagi
SAM.gov · AP
Contact
- kei.akagi.ln@us.navy.mil
- Phone
- 81956502886
- Title
- —
- Type
- primary
Open solicitations
- LPD-18 Ballast Tank 8-110-2-W; inspectSAM.govNagasakiDue Aug 21, 2026
- LPD-18 Various Jettison Locker; refurbishSAM.govNagasakiDue Aug 31, 2026
- LPD-18 No.3 SSDG Crankshaft FR and RR Seal; replaceSAM.govNagasakiDue Aug 27, 2026
- LHA-7 Fan Room and Vent Plenum in 02-114-2-Q; refurbishSAM.govNagasakiDue Aug 28, 2026
- LHA-7 Overhead and Bulkhead above Fixed Ramp Area; preserveSAM.govNagasakiDue Aug 27, 2026
- Lha-7 Sea Water Flushing Piping in Main Deck ;ReplaceSAM.govNagasakiDue Aug 28, 2026
- LHA-7 No.3 JP-5 Purifier and Motor, repairSAM.govNagasakiDue Aug 25, 2026
- LHA-7, Vent Duct (Exhaust System 4-78-2) in Fan Room; clean/ Vent Duct (Supply System 4-79-1) in Fan Room; clean/ Vent Duct (Ex chaust System 4-78-4) in Fan Room; cleanSAM.govNagasakiDue Aug 24, 2026
- Lpd-18 Toxic Gas Damper for Ventilation Supply System (55-16); ReplaceSAM.govNagasakiDue Aug 21, 2026
- LPD-18 Various Jettison Locker; refurbishSAM.govNagasaki
- LPD-18 No.3 SSDG Crankshaft FR and RR Seal; replaceSAM.govNagasaki
- LHA-7 Fan Room and Vent Plenum in 02-114--2-Q; refurbishSAM.govNagasaki
- LHA-7 Overhead and Bulkhead above Fixed Ramp Area; preserveSAM.govNagasaki
- LHA-7 No.3 JP-5 Purifier and Motor, repairSAM.govNagasaki
- LHA-7, Vent Duct (Exhaust System 4-78-2) in Fan Room, clean/ Vent Duct (Supply System 4-79-1) in Fan Room, clean/ Vent Duct (Ex chaust System 4-78-4) in Fan Room, cleanSAM.govNagasaki
- LHA-7 Sea Water Flushing Piping in Main Deck; replaceSAM.govDue Jul 21, 2026
- LHA-7 Electrical Grade Sheeting in 02-93-0-C; replaceSAM.govDue Jul 21, 2026
- Workbench Replacement and Deck Preservation in 02-14-1-M; AccomplishSAM.gov