Title 1 Services -Rehabilitate Whiteriver Campground Utilities System and Loop B comfort Station System
Department of the Interior · WA
- Est. solicitation
- —
- Date posted
- —
- Source
- Open forecast
Description
This project will replace 5740 feet of waterline which supply the ranger and comfort stations at White River Campground. Excavation will start at the water plant, where a meter for distribution and a valve will be installed. From there a four inch high-density polyethylene pipe will be installed at a depth of 30 inches. From the base of the gravel road, crews will place a 3 foot cut in the campground asphalt road through A loop, up to the main road and from the main road to D loop. Asphalt will
Planning details
- Estimated value
- $1M - $1.9M
- Contract type
- To Be Determined
Classifications
- NAICS541310