Acquisition GatewayForecast9444
ZION Recreate Drainage Swales Throughout Watchman Campground for Flood Control
Department of the Interior.Department of the Interior · UT
- Est. solicitation
- —
- Date posted
- —
- Source
- Open forecast
Description
This project will re-establish and improve 2,100 feet of drainage swales in the Watchman Campground area. Construction will include excavating a previous ditch alignment; re-channeling, deepening and berming existing ditches; installing stone revetments and stone check dams; and improving an existing culvert with stone headwall. The ditch delta area will be channel cut and have a boulder revetment mattress installed. Finally, a stone revetment will reinforce an existing beach access route.
Planning details
- Estimated value
- $1M - $1.9M
- Contract type
- To Be Determined
Classifications
- NAICS236220
- PSC236220