FILA Replace Chiller System at Education Research Center

Department of the Interior.Department of the Interior · OH
Est. solicitation
Date posted

Description

The current air-cooled water chiller was installed in 1998 and is constantly failing. This project will consist of the planning, purchasing, installation labor and materials to remove and replace the existing air-cooled chiller at First Ladies National Historic Site Visitor Center. This project will replace a 60 Ton air-cooled water chiller, condenser, and refrigerant piping and insulation. This work will also include replacement of two hydronic pumps in the cool water hydronic loop.

Planning details

Estimated value
$500K - $999K
Contract type
To Be Determined

Classifications

  • NAICS238220
  • PSC238220