Acquisition GatewayForecastAGBOR300186
Pneumatic Sewer Ejectors Replacement (LCB)
Department of the Interior.U.S. Bureau of Reclamation · NV
- Est. solicitation
- —
- Date posted
- —
- Source
- Open forecast
Description
The Hoover Dam wastewater collection system relies on a system of pneumatic sewer ejectors, known as air pots, to transfer sewer water from the bottom of the dam to the Wastewater Treatment Plant. All 5 of them need to be replaced due to corrosion. Lower Colorado Basin
Planning details
- Estimated value
- Below $150K
- Contract type
- Firm Fixed Price
Classifications
- NAICS238220
- PSC238220