Replace HVAC Systems at Goff Hall
- Est. solicitation
- May 22, 2026
- Date posted
- May 14, 2026
- Source
- Open forecast
Description
Complete replacement of various HVAC system(s) components at Goff Hall; including but not limited to: BASE BID - Remove three (3) existing air handlers and existing air cooled condenser. Provide and install three (3) new air handlers in the mechanical mezzanine and a new fluid cooled condenser, with all connections to new equipment, including duct, electrical, fire safety, piping and any/all appurtenances; OPTION 1 - Remove one (1) air handler. Provide and install one (1) new air handler in the mechanical mezzanine and two (2) make up air units with electric duct heater for MAU-1, with all connections to new equipment, including duct, electrical, fire safety, piping and any/all appurtenances; OPTION 2 - Remove fifteen (15) existing VAV/CAV boxes and seven (7) existing exhaust fans. Provide and install new VAV/CAV boxes fifteen (15) total located throughout the building. Provide and install new exhaust fans; seven (7) total, with all connections to new equipment, including duct, electrical, fire safety, piping and any/all appurtenances; OPTION 3 - Remove two (2) existing boilers. Provide and install two (2) new boilers, with all connections to new equipment, including duct, electrical, fire safety, piping and any/all appurtenances; OPTION 4 - Remove one (1) existing electric water heater, two (2) existing cabinet unit heaters, one (1) electric duct heater, and seven (7) existing unit heaters. Provide and install New Electric Water Heater, two (2) Cabinet Unit Heaters, one (1) electric duct heater, and seven (7) unit heaters, with all connections to new equipment, including duct, electrical, fire safety, piping and any/all appurtenances.
Planning details
- Estimated value
- $2M to $5M
- Award quarter
- Q4 2026
- Est. solicitation date
- May 22, 2026
- Anticipated award
- Jul 24, 2026
- Contract vehicle
- Design/Build Construction Services II (Regional) (RMACC II)
- Contract type
- Firm Fixed Price
- Competition
- New Requirement, No Contract
- Status
- NEW
- Fiscal year
- 2026
- Period of performance
- Aug 3, 2026 – Feb 1, 2027
Classifications
- NAICS238220
- PSC238220