West Water Tank Renovation
- Est. solicitation
- —
- Date posted
- —
- Source
- Open forecast
Description
Contractor will provide equipment with adequate water capacity. Contractor will conduct daily filling of temporary water tank to ensure the community has sufficient water supply. An area will be determined for tank resupply for daily use. All potable water tanks designed to store water must be fit for human consumption and made out of materials that adhere to WRAS (Water Regulations Advisory Scheme) guidelines. The Contractor must supply all labor, materials, equipment, tools, services, and insurance for renovating a 32-foot-high, 63-foot-diameter water storage tank (capacity: 670,000 gallons). The project includes sufficient water provision, non-destructive testing (NDT) of steel and welds, interior and exterior renovations (sanding, blasting, sealing, painting), and upgrades to all tank components such as valves, piping, ladders, hatches, gaskets, screens, and tank level indicator (TLI). Location: 19 N Plenty Hawk Drive, Crow Agency, MT 59022. All work must meet NSF/ANSI Standard 61 for potable water safety. The Contractor will provide certification with third-party verification and ensure materials are WRAS-compliant for human consumption. Responsibilities include identifying and marking underground utilities before excavation, repairing any damage to code, supplying daily water during refurbishment, and coordinating with the Water Plant Operator to secure water for over 1650 residents and area businesses (housing, hospital, school, daycare, senior home, veterans complex). Contractor will assess infrastructure, determine water needs, and maintain temporary tanks throughout the project.
Planning details
- Estimated value
- $250K - $499K
- Contract type
- To Be Determined
Classifications
- NAICS237110
- PSC237110