Civic AI
Civic AI
Procurement intelligence
Acquisition GatewayForecastIAFY27081

Colorado River Agency (CRA) Building 2 Basement demo(removal of mod, asbestos, floors, ceilings, walls), HVA, Boiler

Department of the Interior · MT
Est. solicitation
—
Date posted
—

Description

The basement in building 2 has suffered from water damage for years. The extent of the damage has led to mold in areas throughout the basement. The mold has grown into the HVAC system ductwork. Moisture damage is evident throughout the whole basement and not only damaged the flooring but also the walls. Flooring, walls, ceilings are affected by asbestos. A full demo of the basement is required with asbestos and mold taken as the major safety issues. The long-term plan is to restore the basement back into a daily operations working area. This demo request is the first phase of the process. Following phases consist of renovations, HVAC, and boiler. This a unique complex project b/c the mold infiltrated the asbestos containing materials, so they cannot be addresses/corrected separately.

Planning details

Estimated value
$500K - $999K
Contract type
To Be Determined

Classifications

  • NAICS236220
  • PSC236220

Explore more