Acquisition GatewayForecastFY26_007106
Flathorn Gegoka - Weiss Creek Trail Bridge Replacement
Department of Agriculture.Forest Service · MN
- Est. solicitation
- —
- Date posted
- —
- Source
- Open forecast
Description
This project is replacing a cross-country ski trail bridge that was damaged during a storm event in 2024. This project will be funded with ERFO funds. The DDIR number is 71093A-2. The existing multi-span bridge was damaged by debris impact which has caused horizontal deflection of the structure and the abutments scoured. The replacement bridge will be a simple span 125 long x 6-10 wide bridge. The new bridge will be a prefabricated tubular steel truss with timber decking and concrete abutments.
Planning details
- Estimated value
- $500K - $999K
- Contract type
- Firm Fixed Price
Classifications
- NAICS237310
- PSC237310