Acquisition GatewayForecastFY26_003696
AM LRT-FR912-0.1 LITTLE ISABELLA RIVER CULVERT REPLACEMENT
Department of Agriculture.Forest Service · MN
- Est. solicitation
- —
- Date posted
- —
- Source
- Open forecast
Description
The existing Little Isabella River Culverts are a triple 72 wide x 48 high x 32-0 long corrugated metal pipe arch culverts constructed in 1975. The existing culverts are deteriorating and are spanned with timber panel bridging laid over the top of the culverts due to concerns about the integrity of the culverts. The new precast concrete box culverts will be two 24-0 long x 12-0 wide x 5-0 high side by side.
Planning details
- Estimated value
- $500K - $999K
- Contract type
- Firm Fixed Price
Classifications
- NAICS237310
- PSC237310