Description
This contract action is the construction phase to rehabilitate walkways at Haleakala Visitor Center (White Hill) for accessibility. The Title II design development task order is about to be awarded with a performance period = 170 days ~ 6 months. If the design can be completed prior to the contract deadline (which appears to be possible as long as the Class A cost estimate does not exceed $500k), the construction PR will be entered in FY26.
Planning details
- Estimated value
- $250K - $499K
- Contract type
- To Be Determined
Classifications
- NAICS324121
- PSC324121