Acquisition GatewayForecast10628
DESO - 10628 - Milton - Repair Berm and Point Riprap
Department of the Interior · FL
- Est. solicitation
- —
- Date posted
- —
- Source
- Open forecast
Description
The project will repair approximately: 900 lineal feet of stone pillar riprap along berm and point. Approximately 1800-2000 tons of rock armor rip rap will be placed along the shoreline adjacent to the DESO Visitor Center, trail and grounds. Picture of location placement attached. Work will be performed by a contractor.
Planning details
- Estimated value
- $1M - $1.9M
- Contract type
- To Be Determined
Classifications
- NAICS238160
- PSC238160