Acquisition GatewayForecast18194
BICY - 18194 - Stabilize Oasis Off Road Vehicle Trail
Department of the Interior · FL
- Est. solicitation
- —
- Date posted
- —
- Source
- Open forecast
Description
Perform cyclic maintenance on a 19.3 mile off road vehicle trail. Trail stabilization will range from a limited application of limestone rock over existing limestone caprock to applications of geotextile fabric with a limestone rock cover through areas where existing soil is over one foot in depth. Trail will range from ten to twelve feet wide, and all trail beds will NOT extend above existing grade in order to maintain natural hydrological flow. (materials only for this project)
Planning details
- Estimated value
- $250K - $499K
- Contract type
- To Be Determined
Classifications
- NAICS212312
- PSC212312