M6 Road Slide Repair. Mendocino National Forest. Contract number 127EAW26P0008.
Department of Agriculture.Forest Service · CA
- Est. solicitation
- —
- Date posted
- —
- Source
- Open forecast
Description
undertake the excavation of the current deteriorated road template and uphill slumps. the contractor must prepare a structural foundation for the repositioned roadway. The construction of the new structural base is to be completed with backfilling performed as necessary to achieve the sub-base level. the contractor will replace the enhanced road base and surface course. the installation of a geo-composite drainage system is mandated along with the placement of riprap for slope retention. Period of performance 180 days. Requisition number 1157584
Planning details
- Estimated value
- $250K - $499K
- Contract type
- Firm Fixed Price
Classifications
- NAICS237310
- PSC237310