Civic AI
Civic AI
Procurement intelligence
hhs_forecastForecastjkswdwe4uf

Bldg. 5, 26, 53 Air Handling Units (AHU) Replacement at Jefferson Lab Campus

Department of Health and Human Services.Food and Drug Administration.75F401
Est. solicitation
Date posted

Description

Jefferson Lab Complex Bldg. 5B, 26, 53C Air Handling Units (AHU) Replacement. The existing HVAC air handling units (AHU) in Buildings 5B, 26, 53C on the NCTR campus have exceeded the end of their useful life and requires replacement. The work will include demolition of existing air handling unit & heat recovery unit and electrical, associated equipment, controls, duct transitions, piping packages, etc. Installation of new air handling unit & heat recovery unit with all piping ductwork needed for connection to existing services. Extend existing equipment pad as needed for the equipment.

Planning details

Estimated value
>= $3M and < $7M
Anticipated award
Aug 1, 2026

Classifications

  • NAICS236220
  • PSC236220

Explore more