hhs_forecastForecastjkswdwe4uf
Bldg. 5, 26, 53 Air Handling Units (AHU) Replacement at Jefferson Lab Campus
Department of Health and Human Services.Food and Drug Administration.75F401
- Est. solicitation
- —
- Date posted
- —
- Source
- Open forecast
Description
Jefferson Lab Complex Bldg. 5B, 26, 53C Air Handling Units (AHU) Replacement. The existing HVAC air handling units (AHU) in Buildings 5B, 26, 53C on the NCTR campus have exceeded the end of their useful life and requires replacement. The work will include demolition of existing air handling unit & heat recovery unit and electrical, associated equipment, controls, duct transitions, piping packages, etc. Installation of new air handling unit & heat recovery unit with all piping ductwork needed for connection to existing services. Extend existing equipment pad as needed for the equipment.
Planning details
- Estimated value
- >= $3M and < $7M
- Anticipated award
- Aug 1, 2026
Classifications
- NAICS236220
- PSC236220