Acquisition GatewayForecastDOIIA0190
Sewer Pipe Replacement
Department of the Interior.Department of the Interior · AZ
- Est. solicitation
- —
- Date posted
- —
- Source
- Open forecast
Description
New construction to replace the degrading sewer pipe line that was damaged by the latest wildland fire. Cost estimate is $350,000. This will include excavate both ends of the damaged pipe to connect to the existing sewer pipe, transport debris to junk yard, flush system, and new vertical support structures with new foundation (which vary from 3 to 7 supports). Roadside railings installed for safety.
Planning details
- Estimated value
- $250K - $499K
- Contract type
- To Be Determined
Classifications
- NAICS237110
- PSC237110