Acquisition GatewayForecastFY26_003043
Phon D. Sutton River Access Ramp
Department of Agriculture.Forest Service · AZ
- Est. solicitation
- —
- Date posted
- —
- Source
- Open forecast
Description
Design and build contract to provide a durable formalized kayak access route that reduces bank damage separates user groups and enhances recreation safety. The Contractor shall design furnish and construct a hardened cement concrete kayaker access ramp from the east parking lot down to the Salt River. The ramp is a non-accessible route due to steep terrain. Surfacing shall extend the full slope length to the water be adequately anchored and armored along the upstream edge to resist erosion.
Planning details
- Estimated value
- $500K - $999K
- Contract type
- Unknown
Classifications
- NAICS238110
- PSC238110