Acquisition GatewayForecast13007
FOSM - 13007 - Install Exterior Wall Sub-Drain and Repoint Damaged Foundation Fabric at Historic Courthouse
Department of the Interior · AR
- Est. solicitation
- —
- Date posted
- —
- Source
- Open forecast
Description
Funding will allow for the repointing of 1200 sq. ft. of interior stone/rock wall located along the first jail interior; the repainting/whitewashing of the entire interior wall (up to 1500 square feet) of the 1st Jail; and the installation of up to 400 lineal feet of a subsurface drain to remove moisture away from the Visitor Center and First Jail foundations. Funding would also allow for the re-seeding/landscaping repair of the areas affected by the added drain.
Planning details
- Estimated value
- $250K - $499K
- Contract type
- To Be Determined
Classifications
- NAICS237990
- PSC237990