544-21-115 B7 HVAC & Electrical Upgrade Construction
- Response deadline
- Aug 12, 2026 Closed
- Date posted
- Aug 6, 2026
- Source
- Open notice
Description
The purpose of this amendment is to answer questions submitted by perspective offerors: Question 1: Please confirm total number of GC site personnel that will be required to fulfill the roles of GC Superintendent, SSHO, and QC officer. Answer - At least 2. SSHO is stand-alone position. Question 2: Please confirm location of Contractors Job Trailer, Dumpster, and Lay down area on a campus map. Answer - Please refer to Sheet AE100 for Dumpster / Laydown Area. Job trailer is not required. If contractor requires it, will work with them to site. Dumpster/laydown area as shown. Question 3: Please confirm how long the overall time obtaining a badge should take as described in spec section 01 00 00 from the time the initial paperwork is submitted until the time the badge is in the employee s hands. Answer - This will depend on how busy the VA Staff is. Access to the area is only available when warehouse staff are present. ID badge not required. Daily check-in with ECC office in building 100 is required. Question 4: Will the Furniture / Racks / Supplies / Materials be removed by the Government ahead of construction starting? Answer - Yes End of page
Classifications
Documents (15)
- DownloadDavis Bacon General Decision Number SC20260004.pdf.pdf6.1 MB
- DownloadAttachment VIIII - EMR.docx.docx15 KB
- Download20251104 - BLDG 7 - 100Pct Sealed - Specifications - Combined.pdf.pdf9.3 MB
- DownloadAttachment IV COMBINED DRAWINGS.pdf.pdf5.1 MB
- DownloadAttachment VI - SF24-23a Bid Bond.pdf.pdf703 KB
- DownloadAttachment I - Davis Bacon General Decision Number SC20260004.pdf.pdf6.1 MB
- Download20251104 - BLDG 7 - 100Pct Sealed - COMBINED DRAWINGS.pdf.pdf5.1 MB
- Download36C24726Q0685 0001.docx.docx17 KB
- Download36C24726Q0685 0002.docx.docx18 KB
- DownloadAttachment X PPQ .docx.docx104 KB
- DownloadAttachment III Specifications Combined.pdf.pdf9.3 MB
- DownloadAttachment VIII - Compliance with Executive order 13899.pdf.pdf112 KB
- Download36C24726Q0685.docx.docx97 KB
- DownloadAttachment V - 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING.pdf.pdf140 KB
- DownloadAttachment VII - Class Deviation from the Federal Acquisition Regulation.pdf.pdf450 KB
Contacts
- Contract Specialist
Similar contracts
- 2-STEP SEALED BID - TINKER AFB WWYK250019 Remove and Replace Fire Sprinkler in Plasma Booth Dust Collectors and Replace the Building F/A System, B3221OklahomaDue Oct 30, 2026
- Sources Sought / Market Intelligence: Multi-Projects for Army Reserve Program – Construction Management at Risk (CM@Risk) utilizing Other Transaction Authority (OTA)Due Oct 5, 2026
- PLA Survey for Human Performance Wig Lab at WPAFBOhioDue Oct 7, 2026
- HST Roof Safety Construction ProjectDistrict of ColumbiaDue Oct 19, 2026
- Construct US Space Force Integration Facility, F/10852 Wpafb, OhioOhioDue Oct 6, 2026
- Fort Lee Vehicle Recovery RangeVirginiaDue Oct 13, 2026